Credibility ,Comparing costs should only be based on final installed costs. eg. for a domestic, industrial piping system a screwed steel system would cost about 40% more than a copper piping system.
Example :
The price of a titanium / titanium alloy products results from a number of factors:
In year 2000 the price of titanium was about 13 000 to 43 000/tonne..
In 2002 the price of raw titanium was about to 8960/tonne.
In 2005 to-date the price of titanium has varied between 6000 and 9000 /tonne
Ref 2010 ..I have enclosed a chart from the metalprices webpage to illustrate to range of titanium ingot pricing over a 12 month period
The table below can only really be used to give broad relative initial material costs. The figures are based on a reference source originating about 2002
Material | Density | Cost/tonne | Relative | Cost /m3 | Relative |
kg/m3 | /tonne | /tonne | /m3 | /m3 | |
Carbon Steel | 7820 | 550 | 1 | 4301 | 1,0 |
Alloy Steels | 7820 | 830 | 1,51 | 6490,6 | 1,5 |
Cast Iron | 7225 | 830 | 1,51 | 5996,75 | 1,4 |
Stainless Steel | 7780 | 4450 | 8,1 | 34 621 | 8,0 |
Aluminium alloys | 2700 | 2220 | 4,0 | 5994 | 1,4 |
Copper Alloys | 8900 | 5550 | 10,1 | 49 395 | 11,5 |
Zinc alloys | 7100 | 2220 | 4,0 | 15 762 | 3,7 |
Magnesium alloys | 1800 | 4000 | 7,3 | 7200 | 1,8 |
Titanium alloys | 4500 | 17 000 | 30,9 | 76 500 | 17,4 |
Nickel alloys | 8900 | 18 000 | 32,7 | 160 200 | 36,8 |
I have tried to obtain some current (Nov 2010) metal prices from various internet sources and I list them below..These sometimes differ considerably from the table above
Material | Cost/tonne | Relative Cost (weight) |
Relative Cost (volume) |
/tonne | |||
Steel (Billet) LME-Nov-2010 | 321 | 1 | 1 |
Steel (Hot Rolled Plate)-MEPS-July-2010 | 505 | 1,6 | 1,6 |
304 Steel (Hot Rolled Plate)-MEPS-July-2010 | 2 536 | 7,9 | 7,9 |
316 Steel (Hot Rolled Plate)-MEPS-July-2010 | 3 535 | 11 | 11 |
Tin- LME-Nov-2010 | 15 458 | 48 | 45 |
Aluminium Alloy - LME-Nov-2010 | 1 407 | 4,.4 | 1,5 |
Aluminium - LME-Nov-2010 | 1 425 | 4,4 | 1,5 |
Copper - LME -Nov-2010 | 5 279 | 16,4 | 18,7 |
Zinc - LME -Nov-2010 | 1 412 | 4,4 | 4,0 |
Nickel - LME -Nov-2010 | 14 398 | 44 | 51 |
Lead - LME-Nov-2010 | 1 414 | 4,4 | 6,4 |
Titanium (ingot 6AL-4V) steelonthenet (11$/lb) | 15 700 | 49 | 28 |
Prices in dollars for 25mm round bar x 300mm long (0,00015m3 ) ...November 2010 (Onlinemetals (USA)
Metal | Price $ |
1000/tonne |
1000/m3 |
Relative cost (weight) |
Relative cost (volume) |
Steel HR (A56) | 6 | 3,2 | 24,7 | 1 | 1 |
Steel CD (12L40) | 7,4 | 3,9 | 30,5 | 1.23 | 1.23 |
Alloy Steel (4130) | 9,99 | 5,3 | 41,2 | 1.66 | 1.66 |
St.Stl (304L) | 15,34 | 8,1 | 63,2 | 2.6 | 2.56 |
St.Stl (316L) | 20,61 | 10,9 | 84,9 | 3.4 | 3.44 |
Aluminium (2011-T3) | 8,58 | 13,1 | 35,4 | 4.2 | 1.43 |
Copper (C110) | 37,91 | 17,5 | 156,2 | 5.6 | 6.32 |
Brass (C360) | 25,3 | 11,7 | 104,3 | 3.7 | 4.22 |
Bronze | 42,09 | 19,5 | 173,5 | 6.2 | 7.0 |
Titanium (6AL-4VG5) | 107 | 98 | 441 | 31 | 17.8 |
Looking at the cost per tonne of HR steel in the form of a 1" dia round bar 1 foot long at 3200 against the LME price for the raw material in bulk for at 321/tonne illustrates the massive diiference in the price of raw materials to the actual price of materials as supplied for initial machining processes in small quantities.
Source: Yaang Pipe Industry Co., Limited (www.yaang.com)Tel No:+86-18267732328 / Email:[email protected]
Address:Longwan District, Wenzhou, Zhejiang Province, China.
Copyright Notice © www.yaang.com Yaang Pipe Industry Co., Limited All rights reserved.
Yaang Pipe Industry Co., Ltd. is an international supplier of piping solutions for flange, butt welding fittings, socket welding fittings and threaded fittings. Our products are widely used in different industrial fields, including oil and gas, chemical industry, petrochemical industry, power plant, pulp and paper industry, environmental and water conservancy engineering, engineering projects, etc.