Credibility ,Winter construction, we should pay attention to:
(1) for asbestos cement interface, should use hot water mixing material, but not more than 500 c water temperature, such as expansive cement interface, the water temperature should not exceed 350 c;
(2) the temperature falls below - 50 c, unfavorable to the above two kinds of material interface,
(3) after the interface, can use brine mixing sticky mud off mouth maintenance, and cover a good grass curtain. Also can use warm (not frozen) landfill soil interface heat preservation;
(4) testing, the exposed tubes or interface should be cover tightly with careless, no outlet pipe shaft should be backfill, pressure test finished as soon as possible will put clean water, do the preparatory work before the pressure test and pressure testing of water, drainage, etc.
Source: Yaang Pipe Industry Co., Limited (www.yaang.com)
Tel No:+86-18267732328 / Email:[email protected]
Address:Longwan District, Wenzhou, Zhejiang Province, China.
Copyright Notice © www.yaang.com Yaang Pipe Industry Co., Limited All rights reserved.
Yaang Pipe Industry Co., Ltd. is an international supplier of piping solutions for flange, butt welding fittings, socket welding fittings and threaded fittings. Our products are widely used in different industrial fields, including oil and gas, chemical industry, petrochemical industry, power plant, pulp and paper industry, environmental and water conservancy engineering, engineering projects, etc.